Spanner In The Works® Orange Dog Leads For Large Dogs Reflective Leashes, 1.5 Metre Long Lead, Thick 13mm Anti Pull Leash Comfort Handle, Hi Vis Strong 360 Swivel

Prices from
17.22

Sponsored links

COMPARE ALL WEBSHOPS (1)

Description

Amazon 🐾 SAFETY FIRST: Safety is a priority, which is why we have manufactured a strong dog Lead with a reflective weave to the lead. This feature enhances visibility during low-light conditions, ensuring your dogs are visible to passing vehicles and pedestrians, ensuring their safety whilst walking or running. 🐾 STRONG DOG LEAD: Suitable for use with either large or for use as dog leads for medium dogs. Whether you have a majestic Great Dane or a spirited Labrador, our 13mm rope dog lead is designed to cater to their needs. The thick 13mm anti-pull dog leash is perfect for strong, large dogs who tend to pull during walks. 🐾 SUPERIOR DURABILITY: Crafted with care, our dog lead is made from robust 13mm climbing rope and a strong swivel. Ensuring strength and reliability that can withstand even the most adventurous outings with your best friend. 🐾 STRONG SWIVEL CLIP: Means you can trust that your pet will remain securely attached to this durable black dog lead and makes this dog lead a reliable choice for medium to large dogs. 🐾 COMFORT HANDLE: The design of this strong dog lead handle provides a safe secure and comfortable grip for pet owners during long walks or runs with their dog.

Compare webshops (1)

Sponsored links · Some shops pay us a fee

Sort by:

€ 17.22

Description (1)

🐾 SAFETY FIRST: Safety is a priority, which is why we have manufactured a strong dog Lead with a reflective weave to the lead. This feature enhances visibility during low-light conditions, ensuring your dogs are visible to passing vehicles and pedestrians, ensuring their safety whilst walking or running. 🐾 STRONG DOG LEAD: Suitable for use with either large or for use as dog leads for medium dogs. Whether you have a majestic Great Dane or a spirited Labrador, our 13mm rope dog lead is designed to cater to their needs. The thick 13mm anti-pull dog leash is perfect for strong, large dogs who tend to pull during walks. 🐾 SUPERIOR DURABILITY: Crafted with care, our dog lead is made from robust 13mm climbing rope and a strong swivel. Ensuring strength and reliability that can withstand even the most adventurous outings with your best friend. 🐾 STRONG SWIVEL CLIP: Means you can trust that your pet will remain securely attached to this durable black dog lead and makes this dog lead a reliable choice for medium to large dogs. 🐾 COMFORT HANDLE: The design of this strong dog lead handle provides a safe secure and comfortable grip for pet owners during long walks or runs with their dog.


Product specifications

Brand Spanner In The Works
EAN
  • 5065017273439
Color
  • Orange

Featured Choice
€ 17.22
To Shop