Polyester Film Axial Capacitor Assortment Kit - 10pcs Mylar Capacitors with Long Leads, 0.022uF, 630V, for Radio Amplifier & Electronics

Prices from
8.42

Sponsored links

COMPARE ALL WEBSHOPS (2)

Description

Amazon Specification: Voltage: 630V, Capacity: 0.022uF, Diameter: 5.7mm/0.22in, Capacitor body length: 15.3mm/0.6in. Stable property: Stable performance polyester film capacitors. Easy to use: Lightweight with simple structure, easy to use. Application: Suitable for old radios and tube amplifiers. Good choice: Great choice or electronics enthusiasts.

Compare webshops (2)

Sponsored links · Some shops pay us a fee

Sort by:

€ 8.42

€ 8.42

Description (1)

Specification: Voltage: 630V, Capacity: 0.022uF, Diameter: 5.7mm/0.22in, Capacitor body length: 15.3mm/0.6in. Stable property: Stable performance polyester film capacitors. Easy to use: Lightweight with simple structure, easy to use. Application: Suitable for old radios and tube amplifiers. Good choice: Great choice or electronics enthusiasts.


Product specifications

Brand Garosa
EAN
  • 0717207885407
MPN
  • Garosanca3b24v01

Featured Choice
€ 8.42
To Shop