Nobby Classic Comfort Extra Long Lead Length 300 cm Width 20 mm Lime Green

Prices from
13.80

Sponsored links

COMPARE ALL WEBSHOPS (1)

Description

Amazon Extra soft nylon Metal parts matt black Double stitched 3-way adjustable

Compare webshops (1)

Sponsored links · Some shops pay us a fee

Sort by:

€ 13.80

Description (1)

Extra soft nylon Metal parts matt black Double stitched 3-way adjustable


Product specifications

Brand Nobby
EAN
  • 4033766116858
Color
  • Lime green

Featured Choice
€ 13.80
To Shop