Compare webshops (1)
Sponsored links · Some shops pay us a fee
Sort by:
Shops with other sizes
Application without pre-drilling or special tools possible. Effectively avoids thermal bridges. No pressure load on the facade. Quick processing and immediately usable Screw the insulation plugs directly into the holder without pre-drilling. Fiberboard must be pre-drilled with a diameter of 6 mm. To avoid water ingress after installation, close the annular gap between the edge of the dowel and the plaster with sealing glue or acrylic coverable. Snap-on mounting. The reinforced ankle collar prevents possible unscrewing. 100% Nylon