JA Horse JA4012 Lunging Line with Carabiner Hook and Hand Loop 8 m Pink Long, Lead, Equestrian, Extra Soft, Strap, Hook, Nylon, Non-Slip, Includes Bag, Riding

Prices from
20.42

Sponsored links

COMPARE ALL WEBSHOPS (1)

Description

Amazon Extra soft nylon material: comfortable grip and skin-friendly, comfortable to hold and reduces fatigue even during longer workouts. 8 metre length for effective lunging: provides optimal range and freedom of movement for floor work, lunging and gymnastics training with the horse. NON-SLIP SURFACE WITH WRIST STRAP - Ensures a secure grip and better control, even in wet conditions or energetic STURDY CARABINER HOOK: Sturdy metal design allows quick clipping on and off of the halter or cavesson and ensures reliable connection. Includes practical bag: makes it easy to transport and tidy the lunge line, ideal for stables, riding hall or on the go.

Compare webshops (1)

Sponsored links · Some shops pay us a fee

Sort by:

€ 20.42

Description (1)

Extra soft nylon material: comfortable grip and skin-friendly, comfortable to hold and reduces fatigue even during longer workouts. 8 metre length for effective lunging: provides optimal range and freedom of movement for floor work, lunging and gymnastics training with the horse. NON-SLIP SURFACE WITH WRIST STRAP - Ensures a secure grip and better control, even in wet conditions or energetic STURDY CARABINER HOOK: Sturdy metal design allows quick clipping on and off of the halter or cavesson and ensures reliable connection. Includes practical bag: makes it easy to transport and tidy the lunge line, ideal for stables, riding hall or on the go.


Product specifications

Brand JA Horse
EAN
  • 4255578156949
Color
  • Pink

Featured Choice
€ 20.42
To Shop