iPhone Charger Cable, Charging USB Cable Nylon Braided Long Lead Fast Compatible 11 12 13 14 Pro Max Mini XS XR X 10 8 7 Plus 6s 6 SE, (3 Meter)

Prices from
11.33

Sponsored links

COMPARE ALL WEBSHOPS (1)

Description

Amazon Fast Charge & Sync Lightning Cable: This iPhone Braided charging cable supports fast charging (up to 2.4A) while preventing overheating and overcharging, ensure that you and your devices are safe, sync and charge at the same time at the fastest speeds on your windows PC or Mac. Tangle Free Cable: These Reinforced iPhone charger cable have passed 10000+ times bending tests for extra protection and durability. The solid and durable braided armor nylon shield gives the iPhone cable protection and flexible performance than other cable and no need to worry about tangling, effectively prolong the service life. Safe and Stable Charging: This Fast Charging iPhone Charger Cable made by the integrated overheat protection chip and the prevent overcurrent 56KΩ resistor. It intelligently matches the required current and reduces heat.and adopts new reinforced joint technology for extra protection and durability, which extend the life far longer than the other USB to lightning cable. Longer Life: The materials of aluminum shell, nylon braided and 250d fiber core, prevent this fast charging cable from fraying and splitting. This iPhone charging lead has passed withstanding more than 10,000 pcs 90 degree bends test. The strong 22/28AWG tinned copper core has multiple layers of shielding, to provide a smooth fast charging current without disturbance. Certified iPhone Charger: This charging cable is certified and upgraded 8 Pin connector with a fast charging end ensured safe charging for your devices. Enjoy fast charge and data transfer with our nylon braided iPhone charger cable. No More Pop up Messages: Not only is our charging cable made with high-quality materials, ensuring a fast and efficient charge, but it also comes with a no pop message guarantee. No more annoying interruptions while trying to power up your phone. Important Note: This iPhone Charging Cable is USB-A to lightning cable, NOT USB-C to lightning cable.

Compare webshops (1)

Sponsored links · Some shops pay us a fee

Sort by:

€ 11.33

Description (1)

Fast Charge & Sync Lightning Cable: This iPhone Braided charging cable supports fast charging (up to 2.4A) while preventing overheating and overcharging, ensure that you and your devices are safe, sync and charge at the same time at the fastest speeds on your windows PC or Mac. Tangle Free Cable: These Reinforced iPhone charger cable have passed 10000+ times bending tests for extra protection and durability. The solid and durable braided armor nylon shield gives the iPhone cable protection and flexible performance than other cable and no need to worry about tangling, effectively prolong the service life. Safe and Stable Charging: This Fast Charging iPhone Charger Cable made by the integrated overheat protection chip and the prevent overcurrent 56KΩ resistor. It intelligently matches the required current and reduces heat.and adopts new reinforced joint technology for extra protection and durability, which extend the life far longer than the other USB to lightning cable. Longer Life: The materials of aluminum shell, nylon braided and 250d fiber core, prevent this fast charging cable from fraying and splitting. This iPhone charging lead has passed withstanding more than 10,000 pcs 90 degree bends test. The strong 22/28AWG tinned copper core has multiple layers of shielding, to provide a smooth fast charging current without disturbance. Certified iPhone Charger: This charging cable is certified and upgraded 8 Pin connector with a fast charging end ensured safe charging for your devices. Enjoy fast charge and data transfer with our nylon braided iPhone charger cable. No More Pop up Messages: Not only is our charging cable made with high-quality materials, ensuring a fast and efficient charge, but it also comes with a no pop message guarantee. No more annoying interruptions while trying to power up your phone. Important Note: This iPhone Charging Cable is USB-A to lightning cable, NOT USB-C to lightning cable.


Product specifications

Brand Brand-Tech
EAN
  • 5061012640863
Color
  • Black

Featured Choice
€ 11.33
To Shop