Compare webshops (1)
Sponsored links · Some shops pay us a fee
Shops with other sizes
High-quality material: this double lead for 2 dogs is made of high-quality braided nylon rope, which has strong strength and abrasion resistance and is not easy to break, and the connecting parts are made of high-strength calcined alloy with baked enamel treatment, which is not easy to rust and has a high strength. Protective grip: the handle of this double lead for 2 dogs is a soft and comfortable foam handle that can effectively protect the palm, reduce friction, avoid strangulation, make your dog happy and provide you with safety and protection. Dual tow: This lead for two dogs contains two hooks, which means you can pull two puppies at the same time, perfect for families with multiple pets, free your other hand. Product size: This dog lead for large dogs is 150 cm long, the main rope is 100 cm long and 1.2 cm in diameter, the auxiliary rope is 50 cm long and 0.8 cm in diameter, this product is suitable for medium and large dogs from 15 to 40 kg. Perfect gift: this dog lead for large dogs is a perfect gift for families with dogs, whether family, friends or colleagues, they will surely be surprised by this unique gift.