Compare webshops (1)
Sponsored links · Some shops pay us a fee
Sort by:
Shops with other sizes
Long black leather lead: 100% cow, flexible and durable Strong and durable, fine workmanship 1m20 lead, ideal for walking or running Suitable for all types of dogs