100 PROBLEMS EVERY CONSTRUCTION PROJECT MANAGER WILL FACE: What to Do When Subcontractors Are Late, Drawings Missing, Costs Rising, Work Is Behind, and the Client Wants Answers: 1

Prices from
19.80

Sponsored links

COMPARE ALL WEBSHOPS (1)

Description

100 PROBLEMS EVERY CONSTRUCTION PROJECT MANAGER WILL FACE: What to Do When Subcontractors Are Late, Drawings Missing, Costs Rising, Work Is Behind, and the Client Wants Answers: 1

Compare webshops (1)

Sponsored links · Some shops pay us a fee

Sort by:

€ 19.80

Description (0)

100 PROBLEMS EVERY CONSTRUCTION PROJECT MANAGER WILL FACE: What to Do When Subcontractors Are Late, Drawings Missing, Costs Rising, Work Is Behind, and the Client Wants Answers: 1


Product specifications

Brand Independently Published
EAN
  • 9798172297953

Featured Choice
€ 19.80
To Shop